NotablePrimary completion pushed from Dec 1, 2027 to Dec 1, 2029
Study completion pushed from Apr 1, 2028 to Apr 1, 2030
Re-verified, no change to tracked fields
Re-verified, no change to tracked fields
MinorEligibility criteria expanded, about 14 words
Study description expanded, about 13 words
2 versionsRe-verified since Dec 6, 2025, no change to tracked fieldsv155-v156
Show 44 earlier versionsHide 44 earlier versions
MinorStudy description shortened, about 4 wordsv154
MinorStudy description expanded, about 9 wordsv153
MinorEnrollment target: 77 to 80v152
6 versionsRe-verified since Sep 27, 2024, no change to tracked fieldsv146-v151
MinorStart date changed from estimate of Sep 29, 2024 to Sep 23, 2024v145
MinorStart date: Sep 26, 2024 to Sep 29, 2024v144
MinorStart date: Sep 25, 2024 to Sep 26, 2024v143
MinorStart date: Sep 24, 2024 to Sep 25, 2024v142
MinorStart date: Sep 19, 2024 to Sep 24, 2024v141
MinorStart date: Sep 18, 2024 to Sep 19, 2024v140
MinorStart date: Sep 17, 2024 to Sep 18, 2024v139
MinorStart date: Sep 16, 2024 to Sep 17, 2024v138
MinorStart date: Sep 15, 2024 to Sep 16, 2024v137
MinorStart date: Sep 12, 2024 to Sep 15, 2024v136
MinorStart date: Sep 11, 2024 to Sep 12, 2024v135
MinorStart date: Sep 10, 2024 to Sep 11, 2024v134
MinorStart date: Sep 9, 2024 to Sep 10, 2024v133
MinorStart date: Sep 5, 2024 to Sep 9, 2024v132
MinorStart date: Sep 4, 2024 to Sep 5, 2024v131
MinorStart date: Sep 3, 2024 to Sep 4, 2024v130
MinorStart date: Sep 2, 2024 to Sep 3, 2024v129
MinorStart date: Sep 1, 2024 to Sep 2, 2024v128
MinorStart date: Aug 29, 2024 to Sep 1, 2024v127
MinorStart date: Aug 27, 2024 to Aug 29, 2024v126
MinorStart date: Aug 26, 2024 to Aug 27, 2024v125
MinorStart date: Aug 25, 2024 to Aug 26, 2024v124
MinorStart date: Aug 22, 2024 to Aug 25, 2024v123
MinorStart date: Aug 21, 2024 to Aug 22, 2024v122
MinorStart date: Aug 20, 2024 to Aug 21, 2024v121
MinorStart date: Aug 19, 2024 to Aug 20, 2024v120
MinorStart date: Aug 18, 2024 to Aug 19, 2024v119
MinorStart date: Aug 15, 2024 to Aug 18, 2024v118
MinorStart date: Aug 14, 2024 to Aug 15, 2024v117
MinorStart date: Aug 13, 2024 to Aug 14, 2024v116
MinorStart date: Aug 12, 2024 to Aug 13, 2024v115
MinorStart date: Aug 11, 2024 to Aug 12, 2024v114
MinorStart date: Aug 8, 2024 to Aug 11, 2024v113
MinorStart date: Aug 7, 2024 to Aug 8, 2024v112
MinorStart date: Aug 6, 2024 to Aug 7, 2024v111
Notable: the trial’s plan changed such as a big move in its timeline or size, a new primary endpoint, sponsor or phase, or recruiting opened or resumed.
Minor: routine progress and housekeeping, such as sites added or enrollment closed.
Background:
The adrenal glands are 2 small organs that sit on top of each kidney. They release hormones; these are chemicals that control how the body works. Tumors on or outside the adrenal glands are called functional if they release hormones; they are called nonfunctional if they do not. Doctors who treat adrenal tumors need to know which type a person has. Researchers want to find better ways to learn whether an adrenal tumor is functional.
Objective:
To see if a new radioactive tracer (\[68Ga\]Ga-PentixaFor) can make it easier to identify functional adrenal tumors with positron emission tomography (PET) scans.
Eligibility:
People aged 18 years and older with 1 or more adrenal tumors. They must have increased levels of the hormones aldosterone or cortisol. They must also be enrolled in at least 1 other related NIH study (protocols 19-DK-0066, 18-CH-0031, or 09-C-0242).
Design:
Participants will be screened. They may have imaging scans. Their ability to perform normal activities will be reviewed.
Participants will have one PET scan with the study tracer.
The tracer will be given through a tube attached to a needle inserted into a vein. Participants will receive the tracer 1 hour before the scan. They will lie still on a bed while a machine captures images of the inside of their body. The scan will take 45 to 90 minutes.
Participants heart rate, blood pressure, and rate of breathing will be checked before, during, and after the scan.
Participants will have a follow-up visit 3 days after their scan. This visit can be by phone, email, or in person.